top of page
Modern Çok Katlı Binalar

+90 538 380 4634

FORTİS ISTANBUL

  • skype-logo
  • Twitter
  • LinkedIn
  • YouTube
  • Telegram_logo.svg
  • Instagram
  • Facebook
  • TikTok

03 Fire Fighting

  • Fire Extinguishing Tes.
    (Wet or Dry)

  • Welded/Threaded Piping

  • Coupling Piping 

  • Fire Protection Installations

  • Fire Cabinets System

  • Hydrant System

  • Sprinkler System

  • Gas Extinguishing

  • Smoke Control 

  • Ladder Pressurization

  • FM 200 Gas Extinguishing

  • IT and IT rooms Liquid Chemical Extinguishing 

  • CO2 Gas Fire Extinguisher

     

04 Cooling Systems

  • Central Cooling with Chiller

  • Cold Storage,

  • Industrial Refrigeration.

  • Process Cooling

  • Evaporative Cooling




 

06 Plumbing

  • Clean water

  • Hot water

  • Joint Circulation Hot water

  • Gray Water Treatment

  • Dirty Water Installation and Discharge

  • Rain Harvesting and Storage


     

09 CenterShot

Compressed Air system Production or Movement  They are auxiliary systems. The air compressed with the compressor is stored, and it is used in the action of a Pneumatic mechanism in the Process or Pneumatic mechanism, depending on the operating conditions at the place of need.

02 Ventilation System

  • Air handling units

  • RoofTop air conditioning

  • Hospital Hygienic Air Conditioner 

  • Shelter Ventilation

  • Ventilation Channels

  • Fans and Extractors

  • Heat Recovery Systems

  • Ventilation IGK systems

  • Kitchen Ventilation

  • Parking Lot Ventilation

  • Restaurant Ventilation

  • Office Ventilation

  • Industrial Ventilation

  • Cafe Ventilation

  • Factory Ventilation

     

05 Air Conditioning with Air Conditioning

  • VRV or VRF
    air conditioning with Multi Indoor Units

  • Regional Air Conditioning with Multi-system Air Conditioning

  • Local Air Conditioning with Split Air Conditioning

10 Insulation Heat Water Sound

Compressed Air system Production or Movement  They are auxiliary systems. The air compressed with the compressor is stored, and it is used in the action of a Pneumatic mechanism in the Process or Pneumatic mechanism, depending on the operating conditions at the place of need.

07 Natural Gas Installation

  • Our company only makes Mass Housing Natural Gas installations.

  • Our company is only for Mass Housing

  • It makes natural gas installations.

08 Medical Gas Installation

  • Medical Gas Installations
    (Medical Copper Tube)

  • Bedside Connection system

  • Central Gas System

  • Vacuum System
     

01 Heating Systems

  • Individual System 

  • Central System 

  • Gas Liquid and Solid Fuel Systems

  • Cascade Condensing Boilers

  • Radiator Systems

  • Fancoil/ Convector

  •  Px Underfloor Heating Systems with Collector

  • Individual Heating System with Heat Pump Addition

  • Air Conditioned Heating Systems

  • Radiant Heating Systems

  • Renewable Energy Geothermal and Solar Energy Systems


     

09 CenterSweep

Compressed Air system Production or Movement  They are auxiliary systems. The air compressed with the compressor is stored, and it is used in the action of a Pneumatic mechanism in the Process or Pneumatic mechanism, depending on the operating conditions at the place of need.

09 Compressed Air Installation

Compressed Air system Production or Movement  They are auxiliary systems. The air compressed with the compressor is stored, and it is used in the action of a Pneumatic mechanism in the Process or Pneumatic mechanism, depending on the operating conditions at the place of need.
 

Contact Us

SymmetricProject

Kartaltepe, Malazgirt Cd. No:10, 34295, 34295 Kucukcekmece/Istanbul

Contact

+90-538-380-4634

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram

Opening Hours

Mon - Fri

8:00 am – 8:00 pm

Saturday

9:00 am – 7:00 pm

​Sunday

9:00 am – 9:00 pm

SYMMETRIC PROJECT
consultancy
Mechanical Electrical
Installation

Working Hours

Weekdays: 09:00 – 18:00

C.tesi    : 09:00– 13:00

Sunday    :Off

İnfo@simetrikproje.com hata verdiğinden dolayı bir süre kullanılmayacaktır.

© SIMETRIK Pictures and Logos of the Project Cannot Be Used Without Permission 

©2017 Design & Developed Triangle DESING

Simetrik Proje Logo

FORTİS ISTANBUL
Kartaltepe Mah. 1. Malzagirt Cad.
Fortis Residence A Block Floor 7 D:116
Basinekspres Kucukcekmece Istanbul

  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • TikTok

Note: Our company will also serve in Bursa with our Experienced Engineer  .

Our blog and technical information etc. studies for engineers continue. Publication  will be announced when it is ready.

bottom of page